Depending on the specification and installation method, a 30 m² lounge can be installed in 2 to 3 days— prep and lay on days 1 and 2, sanding and sealing on days 2 and 3 – plus 24 hours for curing before light traffic.
Depending on the specification and installation method, a 30 m² lounge can be installed in 2 to 3 days— prep and lay on days 1 and 2, sanding and sealing on days 2 and 3 – plus 24 hours for curing before light traffic.